Skip to content

Kamrajhar Port second container terminal approved for ₹4,288 crore project

The Union Cabinet approved a ₹4,288.26 billion PPP project to build a second container terminal at Kamrajhar Port in Chennai, boosting capacity to 2 million TEU annually.

By News Analysis India · · Updated · 1 min read

Kamrajhar Port second container terminal approved for ₹4,288 crore project

New Delhi, November 25 – The Cabinet, chaired by Prime Minister Narendra Modi, approved a ₹4,288.26 billion project to develop a second container terminal at Kamrajhar Port Ltd in Chennai.

Project scope and financials

The terminal will be 900 m long with a 30 m berth width and an 18 m design draft. It is planned under a public‑private partnership DBFOT model with an estimated cost of ₹4,288.26 billion, including GST. Phase 1 is budgeted at ₹2,429.32 billion and Phase 2 at ₹1,858.94 billion; a separate dredging cost of ₹450 billion will be borne by KPL. The facility will handle 2 million TEU annually – 1.1 million TEU in the first phase and 0.9 million TEU in the second.

Operational impact

Designed for large vessels up to 24,346 TEU and 400 m in length, the terminal will boost KPL’s ability to serve the Chennai‑Ennore industrial corridor and inland South India, handling autos, components, engineering goods, electronics, chemicals and other manufactured products. In FY 2025‑26 KPL moved 4.908 crore tonnes of cargo and 1,008 ships, including over 700,000 TEU, against an existing capacity of 800,000 TEU (88 % utilisation). National container traffic has grown at a 7 % CAGR over five years, while KPL’s traffic rose about 9.9 % CAGR. The concession runs for 40 years with 48 months of construction; Phase 1 will be completed within 24 months of award and commence commercial operations in month 25, while Phase 2 will be built between months 25‑48 and start operations in month 49. The project aligns with Maritime India Vision 2030 and Maritime Amrit Kaal Vision 2047.